Stored for over 8 years, Beech re-sawn from Civil War era beams. We had just three spare boards. Topside now covered with ply and ready for flooring.
Posted in The latest on the house | Leave a Comment »
Reclaimed Beech Ceiling panel over bed and bath rooms
Posted in The latest on the house | 1 Comment »
Haven't counted growth rings yet. Easily 100 in the first three inches from center!
Posted in Sebastian's Shop Work, The latest on the house | Leave a Comment »
Dave Cooper displays the first entry floor tile from Kickapoo sinker log
De-nailing and metal detecting siding, soffit and trim
Posted in Sebastian's Shop Work, The latest on the house | 1 Comment »
Nathan does his figuring to sheath the half cone roof.
Two layers of ply in opposite directions. Nathan made it look easy!
Half cone ready for ice and water sheild
Master Bedroom roof one step closer to terra cotta tiles !!!
Jared takes a break from truss wrapping
You are currently browsing the Onestickatatime's Blog blog archives for September, 2010.